Scan project effort estimator

How many scan positions, days on site and modeling hours does your scan project need? Describe the object, have your documents analyzed as a ZIPZIP – ZIP archive Compressed archive containing several files in one file. Windows opens it without additional software, e.g. catalog and pipe spec for Plant 3D. Background and sources ›, check the quantity schedule – and request a specific quote with the summary.

The task

A reliable quantity estimate for the scan project.

What you want

  • You want to plan scan positions, days on site and modeling realistically.
  • You want to assess all documents in one place.

Our solution

  • Describe the object, let the ZIP of documents be evaluated, check the quantities.
  • Key figures from our project records, editable.

Your advantage

  • Quotes prepared faster.
  • Realistic ranges instead of gut feeling.
  • Summary as a request.
  • Key figures disclosed.

Key figures: registration 9.5 scans per hour + 2 h per project (A. Seitz, 8 Oct 2026)

Loading calculator …

Non-binding effort estimate based on experience – not a quote. We determine the actual effort after reviewing the documents or on site.

Basics, calculation method, examples and FAQ ▸

What is the calculator for?

Why you need it

A revamp succeeds when the as-built data is right. How much effort a laser scan survey takes depends on area, congestion and level of detail – this determines budget, schedule and often also the time window of a plant shutdown.

Which tasks it solves

  • How many days will we be on site – does it fit into the shutdown?
  • Roughly how many hours do registration and modeling take?
  • How large will the point cloud be – what does IT need?

When in the design process

  1. Basics / preliminary planningBudget and schedule for the as-built capture
  2. Basic engineeringScan as the basis for layout and 3D model
  3. Detail engineering–
  4. Installation / commissioning–
  5. Operation / revamp of existing plantsRevamp, extension, documentation of the as-is state

From estimate to quote

  1. AnalyzeDocuments as ZIP, check the quantity schedule
  2. SendSummary + documents to our sales team
  3. Site walkScan areas and positions on the floor plan
  4. QuoteFixed price for scanning and registration
  5. ResultPoint cloud, model or drawings

Scans per day depend on the scan time: an optimized scan with color takes 2 to 6 min depending on the level. Add 2 min to relocate per 10 scans. Higher levels take considerably longer. We count stairwells with 2 scans per landing, tall equipment per floor. The parameters (m² per scan position, minutes per level, data per scan) are guide values and can be changed under “Adjust parameters”. Checklists for scan targets and point cloud delivery are available under Work aids.

What drives the number

Congestion

Densely piped plants need many scan positions with large overlap – every object from at least two sides (design rule from practice).

Level of detail and scan time

Small-bore lines and valves need shorter distances and a longer scan time per scan (with color: optimized 2–6 min, very high 6.5–14 min) – more scans and more data.

Accessibility

Platforms, ladders, hazardous areas and ongoing operation extend the time on site – clarify these during the site walk.

Frequently asked questions

How are the modeling times derived?

From the quantity schedule: pipe length (up to DN 50DN – Nominal size (DN) Designation for the size of pipes, fittings and valves (Diameter Nominal). It is roughly the inside diameter in millimeters but is not an exact dimension. Background and sources › and above), valves, instruments, vessels, equipment and pumps (per item a base body of 30–60 min plus 10 min per nozzle), steel structures (columns and beams derived from platform area and grid size, stairs, ladders, railings) and cable trays – each multiplied by hours per unit. With EdgeWise, the piping share drops; checking and handover are added, plus – optionally – coordination/revision and isometric output. The table in the calculator shows every item; all effort values are guide values and can be changed.

What happens to my documents?

The analysis (with a customer account) runs in your browser – nothing is uploaded. It detects drawing types (floor plan, section, P&IDR&I – Piping and instrumentation diagram Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram). Background and sources ›, isometric, equipment drawing – also from file names and English or Dutch drawing titles), scales, photos, tags of lines, valves and equipment as well as nozzle lists. Each isometric counts as one line. Anything not detected you choose per file yourself – every value in the quantity schedule shows where it comes from and stays editable. To request a quote, send the summary and the documents by e-mail to our sales team.

Why a range instead of a single number?

When estimated from drawings, the number of scans is often far too low. Only the site walk reveals congestion, platforms and passageways.

Do you also scan residential buildings?

Yes – commissioned through your architecture or design office: surveys of existing buildings, floor plans, sections and elevations.

Terms, background and sources 5 terms on this page

Brief explanations for reference. They do not replace the standard or code itself.

ZIP – ZIP archive

Compressed archive containing several files in one file. Windows opens it without additional software, e.g. catalog and pipe spec for Plant 3D.

PDF – Portable Document Format

File format for documents that looks the same on every device and can be printed – e.g. the piping class sheet.

PCF – Piping Component File

Text file with which AutoCAD Plant 3D passes piping data to the isometric generator and to other programs.

DN – Nominal size (DN)

Designation for the size of pipes, fittings and valves (Diameter Nominal). It is roughly the inside diameter in millimeters but is not an exact dimension.

Specified in DIN EN ISO 6708. Which outside diameter belongs to a DN is defined in the dimensional standards, e.g. DIN EN 10220 for steel pipes.

R&I – Piping and instrumentation diagram

Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram).

Symbols and drawing rules: DIN EN ISO 10628-1 and -2. Identification letters for instrumentation: DIN EN 62424 or ISA-5.1.

Sources and origins