Skip to main content
Software und Anwendung für AutoCAD Plant 3D · Autodesk Authorized Training Center · Frankfurt am Main Deutsch · Español · +49 69 9450725-0 · vertrieb@seitz-ingenieure.de

Calculate & Check · Examples without sign-in

Script Preview: Check Plant 3D Scripts Before Registering Them

Whether a part script for AutoCAD Plant 3D creates the right solids, dimensions and connection points usually shows only once it is registered and used in the catalog. The ASEING Script Preview shows it beforehand: the part in 3D, every solid in the build plan and the connection points. Here you see fixed examples from our own scripts and from AutoCAD Plant 3D 2027.

Examples in 3D

The examples load only after the button “Beispiele laden” (load examples) in the frame (4.8 MB). Rotate: drag · Zoom: mouse wheel. The example page is in German.

What you see in the examples

  • 3D view: rotate and zoom the part and view it from the front, top or side.
  • Connection points: the places where Plant 3D connects pipes and parts (S1S1, S2 First and second connection (port 1, port 2) of a component in AutoCAD Plant 3D, e.g. in the catalog and in the isometric configuration. Background and sources ›, S2 …), with position and direction.
  • Parameters: the dimensions set as adjustable values in the script (for example the length L), with default value.
  • Build plan: every solid of the script with its type (for example cylinder or arc), dimensions, position and rotation.
  • Variants: a shut-off valve with ten end variants. What changes compared with the first variant is marked in yellow.
  • Original and rebuild: a duct tee as the Autodesk original and as our own script – switchable.

Limits of the examples

  • The examples are precalculated. You can check your own scripts in “My area” after logging in.
  • Only calculated solids, parameters and build plan are shown – no source code of the Autodesk scripts.
  • Cylinders with two different radii (flange and socket ends of the valve variants) are currently drawn as ellipses by the preview. We are still checking how Plant 3D displays these solids.
  • Best viewed on a computer: the 3D view needs some space.

Check your own scripts yourself

With your customer account you check your own component scripts for AutoCAD Plant 3D yourself – in “My area”: 3D view, parameters, connection points, dimensions, build plan and messages. The scripts are read only in your browser, not uploaded.

Go to My area

Terms, background and sources 3 terms on this page

Brief explanations for reference. They do not replace the standard or code itself.

MB, GB, TB – Megabyte, gigabyte, terabyte

Units for data volumes: 1 GB (gigabyte) = 1,000 MB (megabytes), 1 TB (terabyte) = 1,000 GB.

Operating systems sometimes calculate with 1,024 instead of 1,000. Strictly speaking these units are called MiB, GiB and TiB (standard IEC 80000-13).

S1, S2

First and second connection (port 1, port 2) of a component in AutoCAD Plant 3D, e.g. in the catalog and in the isometric configuration.

R&I – Piping and instrumentation diagram

Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram).

Symbols and drawing rules: DIN EN ISO 10628-1 and -2. Identification letters for instrumentation: DIN EN 62424 or ISA-5.1.

Sources and origins