Economics · Savings
Savings with ASEING: piping specs and project templates for AutoCAD Plant 3D ready-made instead of built yourself
Putting together, calculating and documenting a piping spec by hand and creating it as a Plant 3D catalog takes around 3 weeks – with the ASEING Piping Spec Calculator and our checked catalogs around 30 minutes. We spent 6 weeks building our project template PlantConfig Pro and put 15 years of experience with AutoCAD Plant 3D into it. You use both on day one.
The task
Start projects without first spending weeks on setup.
What you want
- You want to know what building it yourself really costs.
- You want your team to design rather than configure.
- You want to justify the investment to management.
Our solution
- Checked piping spec catalogs and the Piping Spec Calculator.
- The ready-made project template ASEING PlantConfig Pro.
- A calculator with your own figures.
Your advantage
- Weeks of design time freed up for projects.
- The same standard in every project.
- A transparent calculation for the decision.
Source: experience values A. Seitz, as of 24 Nov 2026: piping spec by hand around 3 weeks, with ASEING around 30 minutes; building PlantConfig Pro around 6 weeks, 15 years of experience with AutoCAD Plant 3D.
Where the time goes
Two tasks that come up in almost every Plant 3D project – and that you do not have to solve yourself.
Piping spec in 30 minutes instead of 3 weeks
Finding standards and data sheets, pre-sizing wall thicknesses, documenting and creating the catalog in Plant 3D – compared step by step.
6 weeks to build – for you on day one
Identification, tags, title block, symbols, piping specs and reports: what is in PlantConfig Pro and what you no longer build yourself.
Calculate with your figures
Piping specs per year and your hourly rate – the calculator shows hours and amount. You can change our assumptions.
Calculate savings
Enter how many piping specs you need per year and whether you would build a project template yourself.
Result
| Building it yourself | – |
| With ASEING | – |
| Savings | – |
| Equals working time worth | – |
For comparison: PlantConfig Pro from €2,490 net equals – of your working time.
Calculation with your figures – no guarantee. PlantConfig Pro from €2,490 net (company license, tiered by number of Plant 3D users); catalogs as selected, prices after login.
Frequently asked questions
Where do the figures come from?
They are experience values of A. Seitz from projects with AutoCAD Plant 3D (as of 24 Nov 2026). You can change every assumption in the calculator. We will publish measured values from pilot projects as soon as they are available.
Do the 30 minutes apply to every piping spec?
They apply if the components of your piping spec are included in our checked catalogs. We handle manufacturer-specific valves, block-based components and custom scripts on request – see Piping spec creation.
Does the Piping Spec Calculator replace the design?
No. The calculator provides a preliminary sizing, not a piping design. The binding design remains with you or the responsible party.
What does it cost?
PlantConfig Pro from €2,490 net as a company license, tiered by number of Plant 3D users. You choose catalogs individually or as a package – you see the prices after logging in.
Next step
In 30 minutes via Teams we show you the calculator, catalogs and project template using your example.

Before you go …
Don't miss any training dates, C³ invitations and news on AutoCAD Plant 3D and P&IDR&I – Piping and instrumentation diagram Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram). Background and sources ›.
Our newsletter only arrives when there's something important – concise and with tips from practice.
Terms, background and sources 1 term on this page
Brief explanations for reference. They do not replace the standard or code itself.
- R&I – Piping and instrumentation diagram
Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram).
Symbols and drawing rules: DIN EN ISO 10628-1 and -2. Identification letters for instrumentation: DIN EN 62424 or ISA-5.1.