Training · P&IDR&I – Piping and instrumentation diagram Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram). Background and sources › · Autodesk Authorized Training Center

AutoCAD P&ID Setup

For CADCAD – Computer-Aided Design Computer-aided design and drafting. Background and sources › administration: set up P&ID projects to the company standard
Configure AutoCAD P&ID projects to your company standard: class definitions and symbol library, numbering according to AKZ/KKSAKZ – Plant identifier (AKZ) Identifier of a component according to a plant identification system (AKS) or KKS, in AutoCAD P&ID e.g. in the “Tag” field. Background and sources ›KKS – Power plant identification system Identification of plants, systems, equipment units and components in power plants according to guideline VGB-S-811-01. Background and sources ›, automatic annotation, templates with title block, and reports and lists.

1day
ATCATC – Autodesk Authorized Training Center Training center authorized by Autodesk. A. Seitz Ingenieur GmbH has been an Autodesk ATC since 2011. Background and sources ›Autodesk Authorized Training Center
online+ Frankfurt & on site
from 2 peopleVolume discount

Who is the training for?

Target audience

  • CAD administrators and key users for AutoCAD P&ID
  • Companies with their own plant identification system (AKZ, KKS, RDS-PPRDS-PP – Reference Designation System for Power Plants Identification system for power plants based on the international standard series ISO/IEC 81346; successor to KKS. Background and sources ›)
  • Design teams that maintain project templates

After the training, you can …

  • Customize classes, properties and symbols
  • Automate numbering and annotation according to AKZ/KKS
  • Create templates with layout and title block

Contents

  • Basics and project configuration
  • Symbol definition
  • Lines, properties and property acquisition rules
  • Tag formats, annotations, lists

Prerequisite

P&ID usage. Suitable preparatory course: AutoCAD P&ID Fundamentals.

Process

Four 90-minute blocks per training day with exercises at your own CAD workstation – live online or in Frankfurt. The days are not stretched.

✓ Included: 3 months topic package P&ID / Plant 3D Setup (online manuals + course manuals)

Upcoming dates

No suitable date? As company training, we adapt to your schedule.

Loading dates …

Dates & quote Request a date by email All training dates

Prices per person, net, plus VAT. A tiered discount applies from two participants – the training calendar calculates it immediately. Registration closes 8 days before the start; the course runs with a minimum of 3 participants.

What participants say

"'Impossible' doesn't exist. If a question remained open, it was researched. I can highly recommend it."

Jacqueline Sand, Weber Industrieller Rohrleitungsbau & Anlagenbau

"We really liked the open and warm manner. Our expectations of the training were 100% met."

Dipl.-Ing. (FHFH – University of applied sciences (Fachhochschule) Fachhochschule, today usually a university of applied sciences. “Dipl.-Ing. (FH)” is a degree obtained there. Background and sources ›) Matthias Rusche, WANG Anlagenbau GmbH

All references

10 voices from plant engineering, industry and water management.

References ›

Questions from our training courses

These are the questions participants ask most often – with the answers from the training.

Can the 255-character limit of the drawing properties be increased, or the input length limited?

Neither can be set: each value holds up to 255 characters, and when you create a drawing property you only define a name and a value. Do you still want long revision texts? Create a separate property for each table cell (e.g. REV_A_INDEX, REV_A_DATUM, REV_A_TEXT), distribute very long texts across two fields in the same cell – or manage revisions as a revision line (Non-Engineering palette): each revision is then its own object in the Data Manager and can be exported to Excel.

Where does the information in the title block come from, and how do I insert a revision row?

Insert the title block and revision row in the layout from the palette of non-engineering items; drawing is done in model space only. The content comes from Project Setup (project details/project data such as project number, address) and from the drawing properties (right-click the drawing in the Project Manager > Properties, e.g. DWGDWG – AutoCAD drawing format AutoCAD file format for drawings and 3D models; AutoCAD Plant 3D and AutoCAD P&ID also save in this format. Background and sources › number, title). You do not enter revisions directly in the title block; instead, insert a revision row for each revision and fill it in via the properties. Revision rows are stored in the database and can be analyzed in the Data Manager.

How do I edit P&ID data (many properties at once) in Excel and import it again?

1. In the Data Manager, select the required node, e.g. Equipment, and click Export – "active node only" produces exactly one table; with child nodes, several sheets are created. 2. Change the values in Excel; do not change the column with the internal IDID – Identifier Unique identifier, e.g. the number under which a record is kept in a database. Background and sources › (PnPID), as it is used for matching. If the sheet is protected: Review > Unprotect Sheet. 3. Save the file and close Excel, otherwise it is locked. 4. In the Data Manager, select the same node and click Import. Changed values are highlighted and can be accepted individually or with "Accept All".

Can I rename a project in AutoCAD Plant 3D afterwards?

You want to change the name of a running project: since version 2026 this is possible in Project Setup. How to proceed: 1. Back up the project. 2. Open Project Setup and expand “General Settings”. 3. Click “Project Details”. 4. Under “General Properties” change the “Project name” field and confirm. Do not use spaces or special characters in the new name either. Note: the Autodesk Help only describes the “Project name” field. It says nothing about the project folder and the file names – so do not rename the project folder by hand. Your advantage: you do not have to create a new project for a new name. Background: wish from the Idea Station, ideas 9264328 (35 votes) and 8454443 (12 votes), as of 07.11.2026. Source: Autodesk Help, What’s New in AutoCAD Plant 3D 2026, “Project Enhancements”. Next step: if your project behaves differently than described, write to support@seitz-ingenieure.de – we will look at it together via remote session.

How do I get symbols from the configuration, e.g. nozzles, into my tool palette?

First open the target palette. Then go to Project Setup > P&ID DWG Settings > P&ID Class Definitions, select the class (e.g. Engineering Items > Nozzles > desired nozzle) and click "Add to Tool Palette" in the toolbar above the preview. The symbol is added at the end of the currently open palette and can be dragged and dropped to another palette.

How do I add my own drawing and project properties, e.g. for the title block?

In Project Setup under General Settings > Drawing Properties, first create a category (e.g. "Title block") and the properties below it (e.g. plant section, building); in the Description field you can store an explanatory text. Enter the values for each drawing in the Project Manager: right-click the drawing > Properties. Create project-wide information (e.g. architect, plant designer) in the same way under Project Details. Both types of values can be used in the title block and in tag formats.

All 671 questions from practice in the Infobase

Frequently asked questions

Which plant identification systems are covered?

The focus is on AKZ and KKS; RDS-PP can be set up on the same principle, as can representations according to ISO 10628DIN EN ISO 10628 – Diagrams for the chemical and petrochemical industry Part 1 specifies the kinds of flow diagrams (block, process, P&I diagram) and what each shows; part 2 the graphical symbols. Basis of the symbol library in AutoCAD P&ID. Background and sources ›. The Plant Engineering Infobase explains the background.

Is there a ready-made template?

Yes – ASEING PlantConfig Pro contains ready-to-use P&ID configurations for KKS, AKSAKS – Plant identification system (AKS) Scheme by which an owner or operator gives every plant, component and room a unique name, often for building services. Each operator defines its own AKS. Background and sources ›, RDS-PP and ISO 10628.

Where does the training take place?

Preferably live online from your own workstation – efficient, without travel and resource-friendly. For every date you can also attend in our training room in Frankfurt am Main; for company training, we come to you.

How long is a training day?

A training day consists of four blocks of two 45-minute teaching units each. The days are not stretched – a four-day training course lasts four days.

Is there a discount if several people from your team attend?

Yes. A tiered discount applies from two participants; the training calendar calculates the price immediately when you book.

How late can I register?

Registration closes eight days before the start. The course runs with a minimum of three participants – you will receive confirmation in good time.

Can you run the training just for our team?

Yes – as company training with your project data and company standards, live online, in Frankfurt or at your site. We agree on the date and content with you.

Contact us directly

Write to us or give us a call – we'll get back to you within one business day.

Standards status for this page 2 standards · researched October 2026
StandardContentsCurrent editionReplaced / successor
DIN EN ISO 10628-1Diagrams for the chemical and petrochemical industry – Part 1: Specification of diagramsDIN EN ISO 10628-1:2015-04replaces DIN EN ISO 10628:2001-03
DIN EN ISO 10628-2Diagrams for the chemical and petrochemical industry – Part 2: Graphical symbolsDIN EN ISO 10628-2:2013-04replaces DIN EN ISO 10628:2001-03

Researched at DIN Media, ISOISO – International Organization for Standardization International Organization for Standardization in Geneva: it develops standards that apply worldwide (ISO standards). Background and sources ›, IECIEC – International Electrotechnical Commission International Electrotechnical Commission in Geneva: worldwide standards for electrical engineering and for instrumentation and control. Background and sources › and ASMEASME – American Society of Mechanical Engineers US engineering society. Its codes for piping, flanges and pipe dimensions apply in many plants worldwide. Background and sources ›, as of October 2026. Before binding use, please check the current edition with the standards publisher. Overview of all standards: Plant Engineering Infobase · Standards status.

Terms, background and sources 15 terms on this page

Brief explanations for reference. They do not replace the standard or code itself.

R&I – Piping and instrumentation diagram

Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram).

Symbols and drawing rules: DIN EN ISO 10628-1 and -2. Identification letters for instrumentation: DIN EN 62424 or ISA-5.1.

CAD – Computer-Aided Design

Computer-aided design and drafting.

AKZ – Plant identifier (AKZ)

Identifier of a component according to a plant identification system (AKS) or KKS, in AutoCAD P&ID e.g. in the “Tag” field.

KKS – Power plant identification system

Identification of plants, systems, equipment units and components in power plants according to guideline VGB-S-811-01.

A KKS code is structured from coarse to fine: overall plant, system, equipment unit, component. Its successor is RDS-PP according to ISO/IEC 81346.

ATC – Autodesk Authorized Training Center

Training center authorized by Autodesk. A. Seitz Ingenieur GmbH has been an Autodesk ATC since 2011.

PDF – Portable Document Format

File format for documents that looks the same on every device and can be printed – e.g. the piping class sheet.

RDS-PP – Reference Designation System for Power Plants

Identification system for power plants based on the international standard series ISO/IEC 81346; successor to KKS.

FH – University of applied sciences (Fachhochschule)

Fachhochschule, today usually a university of applied sciences. “Dipl.-Ing. (FH)” is a degree obtained there.

DWG – AutoCAD drawing format

AutoCAD file format for drawings and 3D models; AutoCAD Plant 3D and AutoCAD P&ID also save in this format.

ID – Identifier

Unique identifier, e.g. the number under which a record is kept in a database.

DIN EN ISO 10628 – Diagrams for the chemical and petrochemical industry

Part 1 specifies the kinds of flow diagrams (block, process, P&I diagram) and what each shows; part 2 the graphical symbols. Basis of the symbol library in AutoCAD P&ID.

AKS – Plant identification system (AKS)

Scheme by which an owner or operator gives every plant, component and room a unique name, often for building services. Each operator defines its own AKS.

ISO – International Organization for Standardization

International Organization for Standardization in Geneva: it develops standards that apply worldwide (ISO standards).

ISO was founded in 1947. Its members are the national standards bodies; for Germany, this is DIN.

IEC – International Electrotechnical Commission

International Electrotechnical Commission in Geneva: worldwide standards for electrical engineering and for instrumentation and control.

IEC was founded in 1906. IEC standards adopted in Europe are called “EN IEC …” or “EN 6xxxx”.

ASME – American Society of Mechanical Engineers

US engineering society. Its codes for piping, flanges and pipe dimensions apply in many plants worldwide.

ASME was founded in 1880. Well-known codes: B31.3 (process piping), B16.5 (flanges), B36.10M and B36.19M (pipe dimensions).

Sources and origins