Training · P&IDR&I – Piping and instrumentation diagram Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram). Background and sources › · Autodesk Authorized Training Center
AutoCAD P&ID Fundamentals
For process engineering and drafting: create P&IDs
Create P&IDs with AutoCAD P&ID: Project Manager, symbols for equipment, lines and valves, tagging and annotation, validation and data exchange with Excel.
Who is the training for?
Target audience
- Process engineering, design and technical drafting
- Teams that currently draw P&IDs in AutoCAD 2D
- Teams learning the basics before the Plant 3D training
After the training, you can …
- Draw P&IDs according to ISO 10628DIN EN ISO 10628 – Diagrams for the chemical and petrochemical industry Part 1 specifies the kinds of flow diagrams (block, process, P&I diagram) and what each shows; part 2 the graphical symbols. Basis of the symbol library in AutoCAD P&ID. Background and sources › with intelligent symbols
- Tag, annotate and check plant items
- Export lists to Excel with the Data Manager and import them again
Contents
- Project Manager and workspaces
- Symbols: equipment, lines, valves
- Tagging and annotation
- Creating and modifying routes
- Data Manager, Excel export/import
Prerequisite
AutoCAD 2D course. Suitable preparatory course: AutoCAD Fundamentals – as preparation for Plant 3D and P&ID a condensed day is sufficient.
Process
Four 90-minute blocks per training day with exercises at your own CADCAD – Computer-Aided Design Computer-aided design and drafting. Background and sources › workstation – live online or in Frankfurt. The days are not stretched.
✓ Included: 3 months topic package P&ID Application (online manual + course manual)
Upcoming dates
No suitable date? As company training, we adapt to your schedule.
Loading dates …
Dates & quote Request a date by email All training dates
Prices per person, net, plus VAT. A tiered discount applies from two participants – the training calendar calculates it immediately. Registration closes 8 days before the start; the course runs with a minimum of 3 participants.
What participants say
"We really liked the open and warm manner. Our expectations of the training were 100% met."
Dipl.-Ing. (FHFH – University of applied sciences (Fachhochschule) Fachhochschule, today usually a university of applied sciences. “Dipl.-Ing. (FH)” is a degree obtained there. Background and sources ›) Matthias Rusche, WANG Anlagenbau GmbH
"The entire training was very well organized, planned and delivered."
Milica Ljubisavljevic, Hugo Petersen GmbH
All references
10 voices from plant engineering, industry and water management.
Keep learning
Here's where to go after the training.
AutoCAD P&ID Setup
For CAD administration: set up P&ID projects to the company standard
AutoCAD Plant 3D Fundamentals
For piping design: start with or switch to Plant 3D
Learning path
Four qualification levels, five steps from getting started to project management.
Questions from our training courses
These are the questions participants ask most often – with the answers from the training.
How do I back up my customized interface so it doesn't get lost?
First set up palettes, toolbars, the menu barbar – Unit of pressure Unit of pressure: 1 bar = 100,000 Pa = 0.1 MPa. In plant engineering, it usually refers to the gauge pressure relative to the surroundings (often “barg” or, in German, “bar ü”). Background and sources › and options. Then, via the gear icon in the status bar or the workspace selector in the Quick Access Toolbar, choose "Save Current As". It is advisable to keep the name of the original workspace and append your own abbreviation, e.g. "P&ID ISOISO – International Organization for Standardization International Organization for Standardization in Geneva: it develops standards that apply worldwide (ISO standards). Background and sources › AB". This preserves the original, and you can see which workspace yours is based on. Save again after, for example, switching the palette group – otherwise changes are lost the next time you open Customize User Interface.
After copying, objects show a question mark instead of a number. Why – and how do I assign new tags?
A tag may occur only once in the project; a copy would get the same number, so the program sets a "?". Right-click the object at its edge and choose "Assign Tag"; the button next to the number assigns the next available number. If you have already placed the annotation, deactivate "Place annotation after assigning tag" – otherwise a second annotation is created, which you then select and delete. Preferably copy with the COPY command instead of Ctrl+C/Ctrl+V and use a crossing window (from right to left) so that connected lines are copied as well.
How do I record revision states and restore older drawing versions?
A proven approach: plot every issue as a PDF, with the revision index in the file name and title block. In addition, back up the entire project at each revision point – with the project closed, copy the project folder or store it as a ZIPZIP – ZIP archive Compressed archive containing several files in one file. Windows opens it without additional software, e.g. catalog and pipe spec for Plant 3D. Background and sources › with the date in the name. You can retrieve individual drawings from it via "Copy Drawings to Project". If, on the other hand, you only swap DWGDWG – AutoCAD drawing format AutoCAD file format for drawings and 3D models; AutoCAD Plant 3D and AutoCAD P&ID also save in this format. Background and sources › files in the project folder, the drawing and the project database no longer match.
Why should the project name not contain spaces or special characters?
When you create a project, the project name is also used as the name of the project folder. Spaces, special characters and very long paths can later cause problems with access, copying or backups. A proven approach is a project number with a short name and underscores, e.g. "2026_001_Pumpstation". Enter the full project description in the Description field of the wizard – spaces are no problem there and the text can be changed at any time. Also, do not create projects in synchronized cloud folders, as creating them there can take a very long time.
How can I tell whether a line is correctly connected to equipment?
A plus sign at the end of a line means: not connected. When connected correctly, a nozzle is placed and annotated automatically. For a grid-accurate connection, use Shift + right-click > "Apparent Intersection" and click the line and the equipment outline. In P&ID, preferably use the object snaps Nearest, Node and, if needed, Perpendicular – Endpoint and Midpoint often lead to connections off the grid.
The Project Wizard is not displayed correctly or crashes – what could be the cause?
A common cause is Windows display scaling above 100% (e.g. 125%). Right-click the desktop > Display settings, set scaling to 100%, sign out of Windows and back in, and restart AutoCAD P&ID or Plant 3D. The wizard is then usually displayed in full.
Frequently asked questions
Do I need AutoCAD skills?
Yes, we assume basic AutoCAD 2D skills. For this, we offer the one-day course AutoCAD Fundamentals on the day before the P&ID training.
Is AutoCAD P&ID included in Plant 3D?
Yes, AutoCAD P&ID is part of AutoCAD Plant 3D. The training is suitable for both licenses.
Are our symbols and numbering systems taken into account?
In the public training, we work with a standard project. Custom symbols and plant identification are covered in the "AutoCAD P&ID Setup" training – or in company training.
Where does the training take place?
Preferably live online from your own workstation – efficient, without travel and resource-friendly. For every date you can also attend in our training room in Frankfurt am Main; for company training, we come to you.
How long is a training day?
A training day consists of four blocks of two 45-minute teaching units each. The days are not stretched – a four-day training course lasts four days.
Is there a discount if several people from your team attend?
Yes. A tiered discount applies from two participants; the training calendar calculates the price immediately when you book.
How late can I register?
Registration closes eight days before the start. The course runs with a minimum of three participants – you will receive confirmation in good time.
Can you run the training just for our team?
Yes – as company training with your project data and company standards, live online, in Frankfurt or at your site. We agree on the date and content with you.
Contact us directly
Write to us or give us a call – we'll get back to you within one business day.

Before you go …
Don't miss any training dates, C³ invitations and news on AutoCAD Plant 3D and P&ID.
Our newsletter only arrives when there's something important – concise and with tips from practice.
Standards status for this page 2 standards · researched October 2026
| Standard | Contents | Current edition | Replaced / successor |
|---|---|---|---|
| DIN EN ISO 10628-1 | Diagrams for the chemical and petrochemical industry – Part 1: Specification of diagrams | DIN EN ISO 10628-1:2015-04 | replaces DIN EN ISO 10628:2001-03 |
| DIN EN ISO 10628-2 | Diagrams for the chemical and petrochemical industry – Part 2: Graphical symbols | DIN EN ISO 10628-2:2013-04 | replaces DIN EN ISO 10628:2001-03 |
Researched at DIN Media, ISO, IECIEC – International Electrotechnical Commission International Electrotechnical Commission in Geneva: worldwide standards for electrical engineering and for instrumentation and control. Background and sources › and ASMEASME – American Society of Mechanical Engineers US engineering society. Its codes for piping, flanges and pipe dimensions apply in many plants worldwide. Background and sources ›, as of October 2026. Before binding use, please check the current edition with the standards publisher. Overview of all standards: Plant Engineering Infobase · Standards status.
Terms, background and sources 12 terms on this page
Brief explanations for reference. They do not replace the standard or code itself.
- R&I – Piping and instrumentation diagram
Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram).
Symbols and drawing rules: DIN EN ISO 10628-1 and -2. Identification letters for instrumentation: DIN EN 62424 or ISA-5.1.
- ATC – Autodesk Authorized Training Center
Training center authorized by Autodesk. A. Seitz Ingenieur GmbH has been an Autodesk ATC since 2011.
- PDF – Portable Document Format
File format for documents that looks the same on every device and can be printed – e.g. the piping class sheet.
- DIN EN ISO 10628 – Diagrams for the chemical and petrochemical industry
Part 1 specifies the kinds of flow diagrams (block, process, P&I diagram) and what each shows; part 2 the graphical symbols. Basis of the symbol library in AutoCAD P&ID.
- CAD – Computer-Aided Design
Computer-aided design and drafting.
- FH – University of applied sciences (Fachhochschule)
Fachhochschule, today usually a university of applied sciences. “Dipl.-Ing. (FH)” is a degree obtained there.
- bar – Unit of pressure
Unit of pressure: 1 bar = 100,000 Pa = 0.1 MPa. In plant engineering, it usually refers to the gauge pressure relative to the surroundings (often “barg” or, in German, “bar ü”).
- ISO – International Organization for Standardization
International Organization for Standardization in Geneva: it develops standards that apply worldwide (ISO standards).
ISO was founded in 1947. Its members are the national standards bodies; for Germany, this is DIN.
- ZIP – ZIP archive
Compressed archive containing several files in one file. Windows opens it without additional software, e.g. catalog and pipe spec for Plant 3D.
- DWG – AutoCAD drawing format
AutoCAD file format for drawings and 3D models; AutoCAD Plant 3D and AutoCAD P&ID also save in this format.
- IEC – International Electrotechnical Commission
International Electrotechnical Commission in Geneva: worldwide standards for electrical engineering and for instrumentation and control.
IEC was founded in 1906. IEC standards adopted in Europe are called “EN IEC …” or “EN 6xxxx”.
- ASME – American Society of Mechanical Engineers
US engineering society. Its codes for piping, flanges and pipe dimensions apply in many plants worldwide.
ASME was founded in 1880. Well-known codes: B31.3 (process piping), B16.5 (flanges), B36.10M and B36.19M (pipe dimensions).
Sources and origins
- ISO – International Organization for Standardization (for R&I, ISO)
- IEC – International Electrotechnical Commission (for R&I, IEC)
- Autodesk – Training and Certification (for ATC)
- Wikipedia: Portable Document Format (German) (for PDF)
- DIN Media: DIN EN ISO 10628-1:2015-04 (for DIN EN ISO 10628)
- Wikipedia – Computer-aided design (for CAD)
- Wikipedia: Fachhochschule (for FH)
- BIPM – International System of Units (SI) (for bar)
- Wikipedia: ZIP file format (German) (for ZIP)
- Autodesk – DWG (for DWG)
- ASME – American Society of Mechanical Engineers (for ASME)