Skip to main content
Software und Anwendung für AutoCAD Plant 3D · Autodesk Authorized Training Center · Frankfurt am Main Deutsch · Español · +49 69 9450725-0 · vertrieb@seitz-ingenieure.de

For management

Introducing AutoCAD Plant 3D: what it costs, what it saves, when it pays off

You decide on software, training and standards – your team designs with them. This page covers the four questions that come up before every rollout, with the answers, calculators and evidence you need for the decision. At the end you get a quote for your team.

30 min.instead of about 48 hours per piping spec
6 weeksto build PlantConfig Pro – yours on day one
over 100projects since 2020 alone (10 hours or more)
since 2011Autodesk ATCATC – Autodesk Authorized Training Center Training center authorized by Autodesk. A. Seitz Ingenieur GmbH has been an Autodesk ATC since 2011. Background and sources ›

Four questions before every rollout

Short answers, each with the tool or page where you can check it yourself.

What does the rollout cost?

Three building blocks: training for your team, the project template ASEING PlantConfig Pro (from €2,490 net, company license, 12 months) and the piping spec catalogs you need. Training prices and dates are in the training calendar, catalog prices after you sign in. The quote puts everything together for your team.

Training calendar · PlantConfig Pro · Catalogs

How much time does it save?

Creating a piping spec in Plant 3D by hand – 25 families, 3 connections, testing – takes about 48 hours; with the piping class calculator and our verified catalogs about 30 minutes. The project template took 6 weeks to build – your team installs it with one click. Calculate with your own figures.

Calculate savings · Piping spec in 30 minutes

Which errors are avoided?

Without a standard, every project sets up tagging, symbols, piping specs and reports anew – and every project a little differently. With the project template and checked catalogs, every project works with the same baseline. The Catalog Checker shows errors in Plant 3D catalogs before they end up in the model.

Project template right away · Catalog Checker

When does it pay off?

That depends on your utilization, your hourly rate and the number of your projects. The calculator “Own team or external experts” shows with your figures when your own staff pays off and when an expert is cheaper. We will publish measured values from pilot projects as soon as they are available.

What pays off?

What your team gets

All prices are net, for businesses. The quote states the total for your team.

Building blockWhat your team getsPrice
TrainingIn person in Frankfurt or live online, then 3 months of the matching online manual with a video for every stepper date in the training calendar
ASEING PlantConfig ProReady-made project template for AutoCAD P&IDR&I – Piping and instrumentation diagram Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram). Background and sources › and AutoCAD Plant 3D: tagging, symbols, piping specs, reportsfrom €2,490 net, 12 months
ASEING Piping CatalogsChecked Plant 3D catalogs and the Piping Spec Calculator (preliminary sizing, not a piping design)as selected, prices after sign-in
SupportHelp with your project via remote support; for new companies, the first 45 minutes of the first order are free of chargeHourly rate and contingents

Frequently asked questions

Where do the figures come from?

These are experience values from A. Seitz from projects with AutoCAD Plant 3D (as of 28.11.2026): per family as a copy 1 hour, from scratch 2 to 3 hours, per connection 1 hour, testing 1 hour per working day, 25 families per piping spec. You can change every assumption in the calculator. We will publish measured values from pilot projects as soon as they are available.

Are there percentage figures for the savings?

Not yet. We are starting measurements with pilot customers, before and after. We will only publish percentages once the measurement is available – until then, calculate with your own figures.

Does the Piping Spec Calculator replace the design?

No. The calculator provides a preliminary sizing, not a piping design. The binding design remains with you or the responsible party.

What is in the quote?

Training for the people you name, the project template, the catalogs you need and, on request, a support contingent – with net prices and term.

Next step

Tell us your team size and goal – you will receive a quote within one working day.

Terms, background and sources 2 terms on this page

Brief explanations for reference. They do not replace the standard or code itself.

ATC – Autodesk Authorized Training Center

Training center authorized by Autodesk. A. Seitz Ingenieur GmbH has been an Autodesk ATC since 2011.

R&I – Piping and instrumentation diagram

Flow diagram showing all pipes, valves, equipment and instrumentation of a plant (P&ID, Piping and Instrumentation Diagram).

Symbols and drawing rules: DIN EN ISO 10628-1 and -2. Identification letters for instrumentation: DIN EN 62424 or ISA-5.1.

Sources and origins